top of page

Course Title

Lifting Equipment Safety Maintenance

Lifting Equipment Safety Maintenance training aligned with LOLER 1998, PUWER 1998, and ASME B30, covering pre-use inspection, defect identification, maintenance procedures, and safe withdrawal criteria.

Lifting Equipment Safety Maintenance Training Service in Saudi Arabia

ACCREDITATIONS

Clients

750+

Satisfied Clients

Our Clients

2025

Training Ratings Report

4.89 ★★★★★

Based on 2400+ Reviews

View Ratings Report

4.8 ★★★★★

Based on 1000+ Reviews

Check Reviews

SUCCESS PROOF IN NUMBERS

RESULTS-ORITNTED Training Description

Course Duration

1 Day

Training Delivery Method

Classroom (Instructor-Led)

Instructors Languages

English / Arabic / Urdu / Hindi / Pashto

Certification Provider

Tamkene Saudi Training Center - Approved by TVTC (Technical and Vocational Training Corporation)

Certificate Validity

2 Years (Extendable with additional training hours)

Course Average Passing Rate

97%

Competency Assessment Criteria

Practical Assessment and Knowledge Assessment

Post Training Reporting

Post Training Report + Candidate(s) Training Evaluation Forms

Training Design Methodology

ADDIE Training Design Methodology

Certificate of Successful Completion

Certification is provided upon successful completion. The certificate can be verified through a QR-Code system.

Course Overview

Lifting equipment does not fail without warning. Defects develop progressively — corrosion reduces structural cross-section, fatigue cracks propagate from repeated load cycling, hook throat dimensions increase from overloading, and sling fibres degrade from UV exposure, chemical contamination, and mechanical abrasion. The maintenance and inspection system surrounding lifting equipment exists precisely to catch these defects before they cause a failure under load. When that system fails — because maintenance intervals are not adhered to, defects are not recognized, withdrawal criteria are not known, or records are not kept — the consequence is not a near miss. It is a catastrophic load drop or structural collapse with fatal consequences.


This training course develops the safety maintenance competency required of personnel responsible for the inspection, pre-use checking, routine maintenance, and condition assessment of lifting equipment and lifting accessories in industrial, construction, and facility management environments. The course is aligned with LOLER 1998 — Lifting Operations and Lifting Equipment Regulations 1998 — specifically Regulation 5 (strength and stability), Regulation 7 (marking), Regulation 9 (thorough examination — mandating 6-monthly examination for person-carrying equipment and lifting accessories, 12-monthly for all other lifting equipment), and Regulation 10 (reports and defect notification) — and PUWER 1998 — Provision and Use of Work Equipment Regulations 1998, which requires under Regulation 5 that all work equipment is maintained in an efficient state, efficient working order, and good repair, and under Regulation 6 that inspection records are maintained. Equipment maintenance and inspection standards follow BS 7121-1: Code of Practice for Safe Use of Cranes — Part 1: General, ASME B30.9: Slings, and ASME B30.10: Hooks. The course integrates ISO 45001:2018: Occupational Health and Safety Management Systems and ISO 9001: Quality Management Systems throughout, applying Hazard Identification, Risk Assessment, and Risk Control (HIRARC) and Root Cause Analysis (RCA) across all maintenance and safety domains.

Key Learning Objectives

  • Apply LOLER 1998 and PUWER 1998 legal obligations for lifting equipment maintenance, inspection intervals, record keeping, and defect notification

  • Identify lifting equipment types, structural components, and safety-critical elements requiring priority maintenance attention

  • Conduct pre-use inspections of lifting equipment and lifting accessories identifying defects against LOLER and ASME B30 withdrawal criteria

  • Apply correct withdrawal criteria for wire rope slings, chain slings, webbing slings, shackles, hooks, and below-the-hook devices per ASME B30.9 and ASME B30.10

  • Apply routine maintenance procedures for chain hoists, lever hoists, overhead cranes, and wire rope hoists in accordance with manufacturer and BS 7121-1 requirements

  • Apply HIRARC to lifting equipment maintenance activities covering energy isolation, suspended loads, and confined maintenance access

  • Complete maintenance records, defect logs, and LOLER Regulation 10 defect notifications correctly

  • Apply RCA to lifting equipment defects and maintenance failures to prevent recurrence

Course Outline

1. Introduction to Lifting Equipment Safety Maintenance

  • The three-layer inspection system — pre-use check, in-service inspection, and thorough examination — and how each prevents different failure types

  • Regulatory framework including (LOLER 1998 Regulations 5, 7, 9, and 10, and PUWER 1998 Regulations 5 and 6)

  • Mandatory thorough examination intervals per LOLER Regulation 9 including (6 months for accessories and person-carrying equipment, 12 months for all other lifting equipment)

  • Competent person requirements under LOLER including (practical and theoretical knowledge, and ability to detect and assess defect significance)

  • Common maintenance failures and their consequences including (uninspected fatigue cracks, corroded structural members, and worn chain links beyond withdrawal limits)

2. Lifting Equipment and Accessory Types

  • Lifting machines requiring planned maintenance including (overhead EOT cranes, chain hoists, lever hoists, wire rope hoists, and vehicle-mounted cranes)

  • Lifting accessories requiring pre-use inspection before every use including (wire rope slings, chain slings, webbing slings, shackles, hooks, and lifting beams)

  • Safety-critical elements by equipment type including (brake systems for hoists, structural welds for cranes, and runway beam alignment for EOT cranes)

  • WLL marking requirements per LOLER Regulation 7 — all equipment must display the Safe Working Load clearly

  • Declaration of Conformity requirement for new equipment before first use under LOLER

3. Pre-Use Inspection of Lifting Accessories

  • Wire rope sling inspection per ASME B30.9 — withdrawal at 10% broken wires per lay length, kinking, core protrusion, and corrosion

  • Chain sling inspection per ASME B30.9 — withdrawal at 5% link elongation, 10% cross-section reduction, and visible cracks

  • Webbing sling inspection — withdrawal for cuts, UV degradation, chemical contamination, and illegible load label

  • Shackle inspection per ASME B30.26 — checking pin thread, bow deformation, WLL legibility, and pin security

  • Hook inspection per ASME B30.10 — withdrawal at 10% throat opening increase, 10° twist, any crack, and failed safety latch

  • Rejection procedure — red out-of-service tag, reject log entry, and supervisor notification before further use

4. Lifting Machine Routine Maintenance

  • Chain hoist maintenance including (chain lubrication, load chain stretch check, hook inspection, and brake function test before use)

  • Wire rope hoist maintenance including (rope lubrication, drum groove wear, sheave condition, upper and lower limit switch testing, and brake pad assessment)

  • Overhead EOT crane maintenance per BS 7121-1 including (end carriage wheel flange wear, bridge weld condition, runway rail alignment, and conductor bar inspection)

  • PPM schedule structure including (daily operator checks, weekly maintenance, monthly structural inspection, and annual LOLER examination)

  • Lubrication management — correct lubricant per manufacturer specification and prohibition on lubricating brake components

  • Brake system maintenance — wear indicator monitoring, adjustment procedure, and prohibition on operating with a non-functioning brake

  • Limit switch testing — upper limit at slow speed and lower limit confirming minimum rope turns on drum

5. Defect Assessment, Withdrawal, and Reporting

  • Defect classification — Category 1: immediate withdrawal, Category 2: use before defined date, Category 3: monitor at next inspection

  • Structural defect assessment per BS 7121-1 including (cracks in boom or mast, corrosion reducing wall thickness, and deformed structural members)

  • Internal rope corrosion identification — opening technique and valley break detection for invisible surface wires

  • Rope diameter reduction — withdrawal when reduction exceeds 3% of nominal diameter

  • Immediate danger notification per LOLER Regulation 10 — competent person obligation to notify dutyholder and enforcing authority

  • Withdrawal and tagging procedure — red out-of-service tag, physical removal, and prohibition on overriding without written engineering authority

  • Applying RCA to defects — identifying overloading, missed maintenance, incorrect use, or environmental root cause

6. Maintenance Safety, HSE, and Quality

  • Applying HIRARC to maintenance activities including (energy isolation, exclusion zones below suspended components, and confined space crane runway access)

  • Lockout/Tagout — LOTO for electrical hoists and EOT cranes — isolate, confirm de-energization, and lock before access

  • Working at height during crane maintenance — fall arrest to certified anchor points and MEWP use for high-bay hoist work

  • Integration with ISO 45001:2018 including (lifting equipment in the maintenance risk register and permit-to-work for high-risk tasks)

  • Quality records per ISO 9001 including (PPM completion records, work orders, calibration records, and defect logs)

  • Lifting equipment register management — asset register, examination history, defect record, and next examination date

7. Case Studies and Group Discussions

  • Case studies from lifting equipment failures in Middle East construction, oil and gas, and industrial environments including (chain hoist brake failure from missed maintenance, wire rope sling failure from uninspected valley breaks, and EOT crane derailment from uninspected wheel flange wear) and the importance of proper maintenance training in preventing fatal lifting failures

  • Group discussion on maintenance challenges in regional environments including (corrosion-accelerated deterioration in coastal and offshore environments, managing large accessory fleets during GCC petrochemical turnarounds, and enforcing pre-use inspection discipline in multicultural workforces)

  • Practical inspection exercise — teams inspect a presented set of lifting accessories with seeded defects, apply ASME B30.9 and B30.10 withdrawal criteria, complete the inspection record, and draft the LOLER Regulation 10 notification for Category 1 defects found

1. Introduction to Lifting Equipment Safety Maintenance

  • The three-layer inspection system — pre-use check, in-service inspection, and thorough examination — and how each prevents different failure types

  • Regulatory framework including (LOLER 1998 Regulations 5, 7, 9, and 10, and PUWER 1998 Regulations 5 and 6)

  • Mandatory thorough examination intervals per LOLER Regulation 9 including (6 months for accessories and person-carrying equipment, 12 months for all other lifting equipment)

  • Competent person requirements under LOLER including (practical and theoretical knowledge, and ability to detect and assess defect significance)

  • Common maintenance failures and their consequences including (uninspected fatigue cracks, corroded structural members, and worn chain links beyond withdrawal limits)

2. Lifting Equipment and Accessory Types

  • Lifting machines requiring planned maintenance including (overhead EOT cranes, chain hoists, lever hoists, wire rope hoists, and vehicle-mounted cranes)

  • Lifting accessories requiring pre-use inspection before every use including (wire rope slings, chain slings, webbing slings, shackles, hooks, and lifting beams)

  • Safety-critical elements by equipment type including (brake systems for hoists, structural welds for cranes, and runway beam alignment for EOT cranes)

  • WLL marking requirements per LOLER Regulation 7 — all equipment must display the Safe Working Load clearly

  • Declaration of Conformity requirement for new equipment before first use under LOLER

3. Pre-Use Inspection of Lifting Accessories

  • Wire rope sling inspection per ASME B30.9 — withdrawal at 10% broken wires per lay length, kinking, core protrusion, and corrosion

  • Chain sling inspection per ASME B30.9 — withdrawal at 5% link elongation, 10% cross-section reduction, and visible cracks

  • Webbing sling inspection — withdrawal for cuts, UV degradation, chemical contamination, and illegible load label

  • Shackle inspection per ASME B30.26 — checking pin thread, bow deformation, WLL legibility, and pin security

  • Hook inspection per ASME B30.10 — withdrawal at 10% throat opening increase, 10° twist, any crack, and failed safety latch

  • Rejection procedure — red out-of-service tag, reject log entry, and supervisor notification before further use

4. Lifting Machine Routine Maintenance

  • Chain hoist maintenance including (chain lubrication, load chain stretch check, hook inspection, and brake function test before use)

  • Wire rope hoist maintenance including (rope lubrication, drum groove wear, sheave condition, upper and lower limit switch testing, and brake pad assessment)

  • Overhead EOT crane maintenance per BS 7121-1 including (end carriage wheel flange wear, bridge weld condition, runway rail alignment, and conductor bar inspection)

  • PPM schedule structure including (daily operator checks, weekly maintenance, monthly structural inspection, and annual LOLER examination)

  • Lubrication management — correct lubricant per manufacturer specification and prohibition on lubricating brake components

  • Brake system maintenance — wear indicator monitoring, adjustment procedure, and prohibition on operating with a non-functioning brake

  • Limit switch testing — upper limit at slow speed and lower limit confirming minimum rope turns on drum

5. Defect Assessment, Withdrawal, and Reporting

  • Defect classification — Category 1: immediate withdrawal, Category 2: use before defined date, Category 3: monitor at next inspection

  • Structural defect assessment per BS 7121-1 including (cracks in boom or mast, corrosion reducing wall thickness, and deformed structural members)

  • Internal rope corrosion identification — opening technique and valley break detection for invisible surface wires

  • Rope diameter reduction — withdrawal when reduction exceeds 3% of nominal diameter

  • Immediate danger notification per LOLER Regulation 10 — competent person obligation to notify dutyholder and enforcing authority

  • Withdrawal and tagging procedure — red out-of-service tag, physical removal, and prohibition on overriding without written engineering authority

  • Applying RCA to defects — identifying overloading, missed maintenance, incorrect use, or environmental root cause

6. Maintenance Safety, HSE, and Quality

  • Applying HIRARC to maintenance activities including (energy isolation, exclusion zones below suspended components, and confined space crane runway access)

  • Lockout/Tagout — LOTO for electrical hoists and EOT cranes — isolate, confirm de-energization, and lock before access

  • Working at height during crane maintenance — fall arrest to certified anchor points and MEWP use for high-bay hoist work

  • Integration with ISO 45001:2018 including (lifting equipment in the maintenance risk register and permit-to-work for high-risk tasks)

  • Quality records per ISO 9001 including (PPM completion records, work orders, calibration records, and defect logs)

  • Lifting equipment register management — asset register, examination history, defect record, and next examination date

7. Case Studies and Group Discussions

  • Case studies from lifting equipment failures in Middle East construction, oil and gas, and industrial environments including (chain hoist brake failure from missed maintenance, wire rope sling failure from uninspected valley breaks, and EOT crane derailment from uninspected wheel flange wear) and the importance of proper maintenance training in preventing fatal lifting failures

  • Group discussion on maintenance challenges in regional environments including (corrosion-accelerated deterioration in coastal and offshore environments, managing large accessory fleets during GCC petrochemical turnarounds, and enforcing pre-use inspection discipline in multicultural workforces)

  • Practical inspection exercise — teams inspect a presented set of lifting accessories with seeded defects, apply ASME B30.9 and B30.10 withdrawal criteria, complete the inspection record, and draft the LOLER Regulation 10 notification for Category 1 defects found

Group Exercises

  • PPM schedule development workshop — teams develop a LOLER-compliant maintenance schedule for a presented mixed lifting fleet, assigning examination intervals and maintenance tasks by equipment type

  • Defect investigation exercise — groups apply RCA to a presented wire rope sling failure, identify root causes across inspection frequency, pre-use check discipline, and storage, and develop a corrective action plan for the maintenance program

Gained Core Technical Skills

  • Ability to apply LOLER 1998 Regulations 5, 7, 9, and 10 — examination intervals, competent person obligations, and defect notification requirements

  • Proficiency in pre-use inspection of wire rope slings, chain slings, webbing slings, shackles, and hooks with precise withdrawal criteria per ASME B30.9 and ASME B30.10

  • Competency in routine maintenance of chain hoists, wire rope hoists, and EOT cranes per BS 7121-1 — lubrication, brake testing, limit switch testing, and structural inspection

  • Skill in classifying defects as Category 1, 2, or 3 and completing LOLER Regulation 10 immediate danger notifications correctly

  • Ability to develop LOLER-compliant PPM schedules for mixed lifting fleets with correct examination intervals by equipment type

  • Proficiency in applying HIRARC to maintenance activities — LOTO for hoists, fall arrest during crane maintenance, and confined space runway inspection

  • Competency in maintaining lifting equipment registers, PPM records, defect logs, and examination records per LOLER and ISO 9001

  • Skill in applying RCA to lifting equipment defects — identifying maintenance interval, overloading, incorrect use, and environmental root causes

  • Understanding of how PUWER 1998 maintenance and inspection obligations integrate with LOLER thorough examination to form the complete lifting equipment safety management framework

Services Geographical Coverage

In Tamkene Training Center or at our client's facility (On-Site), Covering All Saudi Arabia Cities and Locations:


Targeted Audience

  • Maintenance technicians and mechanical engineers responsible for routine lifting equipment maintenance and defect reporting

  • Riggers, slingers, and lifting equipment operators required to conduct pre-use inspections before every operation

  • HSE officers and safety supervisors responsible for lifting equipment safety programs and LOLER record management

  • Lifting equipment engineers and inspection personnel responsible for in-service inspection and thorough examination preparation

  • Facility managers and engineering managers responsible for lifting equipment fleet management and regulatory compliance

  • Any personnel whose role involves operating, maintaining, or inspecting lifting equipment and accessories in industrial, construction, and facility environments

Practical Assessment

  • Lifting accessory inspection practical — inspecting wire rope slings, chain slings, webbing slings, shackles, and hooks against LOLER and ASME B30 withdrawal criteria and completing the inspection record

  • Defect identification and reporting exercise — classifying seeded defects by category, completing the defect log, and drafting the LOLER Regulation 10 notification for the Category 1 item

  • Maintenance checklist completion — completing a chain hoist and EOT crane pre-use and maintenance checklist for a presented scenario and identifying priority action items

Knowledge Assessment

  • Regulatory questions per LOLER 1998 and PUWER 1998 including (examination intervals, competent person definition, Regulation 10 trigger, and PUWER Regulation 5 obligation)

  • Withdrawal criteria questions per ASME B30.9 and ASME B30.10 including (broken wire threshold, chain elongation percentage, hook throat increase percentage, and webbing UV withdrawal indicators)

  • Maintenance procedure questions per BS 7121-1 including (chain hoist PPM components, brake test sequence, limit switch test procedure, and lubrication prohibition zone)

  • HSE and quality questions including (LOTO requirement for EOT maintenance, HIRARC hazard for maintenance below a suspended crane bridge, defect category for a described hook condition, and Regulation 10 notification procedure)

Why Choose This Course

  • Aligned with LOLER 1998, PUWER 1998, BS 7121-1, ASME B30.9, ASME B30.10, ASME B30.26, ISO 45001:2018, and ISO 9001

  • Withdrawal criteria are taught with precise numerical thresholds — 10% broken wires, 5% chain elongation, 10% hook throat — not vague general guidance

  • Covers both lifting machine maintenance and lifting accessory pre-use inspection in a single integrated program

  • LOLER Regulation 10 notification is practiced under assessment conditions — developing compliance documentation competency directly applicable to the workplace

  • Seeded defect practical exercises develop hands-on defect recognition — the most critical skill for lifting equipment maintenance personnel

  • Incorporates Middle East maintenance challenges including coastal corrosion acceleration, turnaround fleet management, and multilingual pre-use inspection culture development

Note: This course outline, including specific topics, modules, and duration, can be customized based on the specific needs and requirements of the client.

IPAF - 1a Static Vertical Personnel Platform Operator Training Course
IPAF - 1a Static Vertical Personnel Platform Operator
Learn More
SASO Approved - Motor Grader Operator Training Course
SASO - Motor Graders Operator
Learn More
SASO & LEEA - Forklift Operator Training Course
SASO & LEEA - Forklift Operator
Learn More
Fire Warden Training Course
Fire Warden
Learn More

Recommended Courses

All Courses
FAQ: Is Tamkene Approved by Aramco? Yes
Is Tamkene approved by Aramco? Yes
Learn More
FAQ: Is Tamkene Approved by TVTC? Yes, Read More
Is Tamkene approved locally by TVTC? Yes
Learn More
FAQ: Training Services | Covering all Saudi Arabia cities
Does Tamkene training services covers all Saudi Arabia cities? Yes we do
Learn More
FAQ: How to verify a certificate or a card from Tamkene?
How to verify a certificate or a card from Tamkene?
Learn More

Suggested Questions

All FAQs
Confined Space Entry & Rescue
Dalal AlSaeed

The training I received from Tamkene was truly exceptional.

Dalal AlSaeed

SASO & LEEA - RIGGER 1
Wafi AlZayer

Choosing Tamkene for our professional development was a game-changer.

Wafi AlZayer

Fire Fighting
Saad AlMisehal

Tamkene delivered quality training with a strong focus on standards. The organization and delivery exceeded our expectations.

Saad AlMisehal

Testimonial

Client Testimonials 

bottom of page