top of page

ACCREDITATIONS

Clients

Course Duration

1 Day

Training Delivery Method

Classroom (Instructor-Led)

Instructors Languages

English / Arabic / Urdu / Hindi / Pashto

Certification Provider

Tamkene Saudi Training Center - Approved by TVTC (Technical and Vocational Training Corporation)

Certificate Validity

2 Years (Extendable with additional training hours)

Course Average Passing Rate

96%

Competency Assessment Criteria

Practical Assessment and Knowledge Assessment

Post Training Reporting

Post Training Report(s) + Candidate(s) Training Evaluation Forms

Training Design Methodology

ADDIE Training Design Methodology

Certificate of Successful Completion

Certification is provided upon successful completion. The certificate can be verified through a QR-Code system.

Course Overview

This intensive Rubber Tire Gantry Crane (RTG) Operator training course provides essential knowledge and practical skills for safely operating RTG cranes in container terminals, intermodal yards, and port facilities. Participants learn precise load control techniques, container stacking procedures, spreader operations, and regulatory compliance requirements specific to rubber-tired gantry crane operations.


The course emphasizes hands-on training with real RTG equipment, covering pre-operational inspections, anti-collision systems, precision positioning, and emergency procedures. Participants develop competency in container handling, yard navigation, twist lock operations, load weight management, and safe stacking practices while adhering to OSHA, ASME, and ISO safety standards for mobile crane operations and container terminal activities.

Key Learning Objectives
  • Demonstrate safe RTG crane operation techniques following OSHA 29 CFR 1910.179, ASME B30.2, and ISO 9927 standards

  • Perform comprehensive pre-operational inspections of RTG systems including structural components, hydraulic systems, electrical controls, and safety devices

  • Execute precise container lifting, stacking, and retrieval operations using proper spreader control and twist lock engagement

  • Apply load weight verification methods, capacity calculations, and stability principles for safe container handling

  • Implement anti-collision systems, proximity sensors, and automatic positioning controls for safe yard operations

  • Navigate RTG cranes safely through container yards considering traffic patterns, ground conditions, and operational clearances

  • Identify and respond to equipment malfunctions, emergency situations, and hazardous conditions during crane operations

  • Complete required documentation including operational logs, inspection reports, incident records, and maintenance requests

Course Outline

1. RTG Crane Systems and Components

  • RTG crane types and configurations including (diesel-electric RTGs, full-electric RTGs, hybrid systems, span dimensions and capacities)

  • Structural components including (portal frame, gantry legs, trolley system, spreader suspension, rubber tire assemblies)

  • Power and drive systems including (diesel generators, electrical distribution, traction motors, steering systems, regenerative braking)

  • Control systems including (operator cabin controls, joystick operations, touchscreen interfaces, automated positioning systems)


2. Regulatory Framework and Safety Standards

  • OSHA 29 CFR 1910.179 compliance including (crane operator qualification, inspection requirements, operational limitations, safe load indicators)

  • ASME B30.2 standards including (overhead and gantry crane requirements, maintenance protocols, testing procedures, documentation standards)

  • ISO 9927 specifications including (rubber-tired gantry crane design, safety devices, operational parameters, performance requirements)

  • Terminal safety protocols including (traffic management rules, communication procedures, personal protective equipment, emergency response plans)


3. Pre-Operational Inspection Procedures

  • Visual inspection checklist including (structural integrity assessment, tire condition examination, hydraulic leak detection, electrical connection verification)

  • Functional testing including (hoist and trolley operations, steering response, brake system functionality, safety device verification)

  • Safety system checks including (anti-collision sensors, overload protection, emergency stop functions, load moment indicators)

  • Documentation requirements including (inspection form completion, defect reporting procedures, maintenance history review, operational readiness determination)


4. Spreader Operations and Container Handling

  • Spreader control techniques including (telescoping adjustments for 20/40-foot containers, twist lock engagement, load cell monitoring, position verification)

  • Container lifting procedures including (spreader positioning accuracy, twist lock confirmation, gradual load application, height control)

  • Load weight verification including (scale system readings, shipping documentation review, overload alarm response, capacity compliance)

  • Container condition assessment including (corner casting inspection, structural damage identification, door security verification, rejection criteria)


5. Container Stacking and Yard Operations

  • Stacking patterns and configurations including (block layouts, height limitations, ground slot positioning, accessibility planning)

  • Precision positioning techniques including (optical positioning systems, laser alignment, automated anti-sway, manual fine-tuning)

  • Stacking sequence optimization including (container retrieval planning, shuffle move minimization, operational efficiency, safety considerations)

  • Ground condition assessment including (surface stability, drainage verification, pavement integrity, load-bearing capacity)


6. RTG Navigation and Traffic Management

  • Yard navigation techniques including (travel lane usage, speed control, turning procedures, clearance verification)

  • Anti-collision system operation including (proximity sensor monitoring, automatic stopping, override procedures, adjacent RTG coordination)

  • Traffic coordination including (radio communication protocols, visual signals, simultaneous operations, pedestrian awareness)

  • Environmental considerations including (wind speed limitations, visibility restrictions, adverse weather operations, work stoppage criteria)


7. Emergency Procedures and Problem Resolution

  • Equipment malfunctions including (hydraulic failures, electrical system issues, steering problems, brake failures)

  • Suspended load emergencies including (power loss procedures, twist lock failures, emergency lowering, load securing)

  • Collision avoidance including (anti-collision alarm response, manual intervention, damage assessment, incident reporting)

  • Fire and evacuation procedures including (electrical fire response, emergency shutdown, evacuation routes, emergency services contact)


8. Performance Optimization and Best Practices

  • Operational efficiency techniques including (cycle time optimization, energy conservation practices, productive movement patterns, idle time reduction)

  • Load stability management including (anti-sway control techniques, acceleration and deceleration rates, wind compensation, smooth operations)

  • Communication protocols including (radio discipline, standard terminology, hand signals, supervisor coordination)

  • Continuous improvement including (identifying operational inefficiencies, suggesting safety enhancements, participating in toolbox talks, skills development)

1. RTG Crane Systems and Components

  • RTG crane types and configurations including (diesel-electric RTGs, full-electric RTGs, hybrid systems, span dimensions and capacities)

  • Structural components including (portal frame, gantry legs, trolley system, spreader suspension, rubber tire assemblies)

  • Power and drive systems including (diesel generators, electrical distribution, traction motors, steering systems, regenerative braking)

  • Control systems including (operator cabin controls, joystick operations, touchscreen interfaces, automated positioning systems)


2. Regulatory Framework and Safety Standards

  • OSHA 29 CFR 1910.179 compliance including (crane operator qualification, inspection requirements, operational limitations, safe load indicators)

  • ASME B30.2 standards including (overhead and gantry crane requirements, maintenance protocols, testing procedures, documentation standards)

  • ISO 9927 specifications including (rubber-tired gantry crane design, safety devices, operational parameters, performance requirements)

  • Terminal safety protocols including (traffic management rules, communication procedures, personal protective equipment, emergency response plans)


3. Pre-Operational Inspection Procedures

  • Visual inspection checklist including (structural integrity assessment, tire condition examination, hydraulic leak detection, electrical connection verification)

  • Functional testing including (hoist and trolley operations, steering response, brake system functionality, safety device verification)

  • Safety system checks including (anti-collision sensors, overload protection, emergency stop functions, load moment indicators)

  • Documentation requirements including (inspection form completion, defect reporting procedures, maintenance history review, operational readiness determination)


4. Spreader Operations and Container Handling

  • Spreader control techniques including (telescoping adjustments for 20/40-foot containers, twist lock engagement, load cell monitoring, position verification)

  • Container lifting procedures including (spreader positioning accuracy, twist lock confirmation, gradual load application, height control)

  • Load weight verification including (scale system readings, shipping documentation review, overload alarm response, capacity compliance)

  • Container condition assessment including (corner casting inspection, structural damage identification, door security verification, rejection criteria)


5. Container Stacking and Yard Operations

  • Stacking patterns and configurations including (block layouts, height limitations, ground slot positioning, accessibility planning)

  • Precision positioning techniques including (optical positioning systems, laser alignment, automated anti-sway, manual fine-tuning)

  • Stacking sequence optimization including (container retrieval planning, shuffle move minimization, operational efficiency, safety considerations)

  • Ground condition assessment including (surface stability, drainage verification, pavement integrity, load-bearing capacity)


6. RTG Navigation and Traffic Management

  • Yard navigation techniques including (travel lane usage, speed control, turning procedures, clearance verification)

  • Anti-collision system operation including (proximity sensor monitoring, automatic stopping, override procedures, adjacent RTG coordination)

  • Traffic coordination including (radio communication protocols, visual signals, simultaneous operations, pedestrian awareness)

  • Environmental considerations including (wind speed limitations, visibility restrictions, adverse weather operations, work stoppage criteria)


7. Emergency Procedures and Problem Resolution

  • Equipment malfunctions including (hydraulic failures, electrical system issues, steering problems, brake failures)

  • Suspended load emergencies including (power loss procedures, twist lock failures, emergency lowering, load securing)

  • Collision avoidance including (anti-collision alarm response, manual intervention, damage assessment, incident reporting)

  • Fire and evacuation procedures including (electrical fire response, emergency shutdown, evacuation routes, emergency services contact)


8. Performance Optimization and Best Practices

  • Operational efficiency techniques including (cycle time optimization, energy conservation practices, productive movement patterns, idle time reduction)

  • Load stability management including (anti-sway control techniques, acceleration and deceleration rates, wind compensation, smooth operations)

  • Communication protocols including (radio discipline, standard terminology, hand signals, supervisor coordination)

  • Continuous improvement including (identifying operational inefficiencies, suggesting safety enhancements, participating in toolbox talks, skills development)

Group Exercises
  • Inspection team activity including (collaborative RTG examination, shared defect identification, group documentation completion, findings presentation to class)

  • Yard planning workshop including (analyzing container yard layout, optimizing stacking patterns, identifying traffic flow improvements, developing operational efficiency strategies)

  • Emergency response drill including (team coordination during simulated crisis, role assignment for incident management, communication practice, solution development and debriefing)

  • Best practices discussion including (sharing operational experiences, identifying common challenges, developing safety improvement recommendations, lessons learned compilation)

Gained Core Technical Skills
  • RTG crane operation including (spreader control, container lifting and landing, precise positioning, stacking operations)

  • Pre-operational inspections including (structural examination, hydraulic and electrical system checks, safety device verification, documentation completion)

  • Container handling including (twist lock engagement, load weight verification, container condition assessment, proper lifting techniques)

  • Anti-collision systems including (proximity sensor monitoring, automatic positioning, override procedures, adjacent equipment coordination)

  • Yard navigation including (travel lane usage, speed management, turning techniques, clearance verification)

  • Load stability including (anti-sway control, acceleration management, wind compensation, smooth operational techniques)

  • Emergency response including (equipment malfunction procedures, suspended load protocols, collision response, evacuation procedures)

  • Regulatory compliance including (OSHA 29 CFR 1910.179, ASME B30.2, ISO 9927 standards, inspection and documentation requirements)

Service Coverage

In Tamkene Training Center or On-Site: Covering Saudi Arabia (Dammam - Khobar - Dhahran - Jubail - Riyadh - Jeddah - Tabuk - Madinah - NEOM - Qassim - Makkah - Any City in Saudi Arabia) - MENA Region

Targeted Audience
  • Container terminal operators requiring certification in RTG crane operation and container handling

  • Port equipment operators transitioning from other crane types to rubber-tired gantry cranes

  • Intermodal yard personnel responsible for container stacking and retrieval operations

  • Crane operators seeking specialized training in modern automated RTG systems

  • Terminal supervisors overseeing RTG operations and operator performance

  • Safety coordinators managing RTG crane operations and terminal safety programs

  • Equipment maintenance personnel requiring operational knowledge for troubleshooting and repairs

  • New hires in container terminal operations requiring foundational RTG operator training

Practical Assessment
  • Pre-operational inspection demonstration including (conducting complete RTG inspection, testing all systems, documenting findings, determining operational readiness)

  • Container handling exercise including (positioning spreader accurately, engaging twist locks, lifting container safely, controlling load movement precisely)

  • Stacking operation including (navigating to designated stack location, positioning container in tight slot, landing accurately, releasing twist locks properly)

  • Emergency procedure simulation including (responding to equipment malfunction, managing suspended load situation, executing emergency shutdown, implementing proper communication)

Knowledge Assessment
  • Written examination including (multiple-choice questions on RTG components, scenario-based safety questions, regulatory compliance verification, capacity calculations)

  • Regulatory standards quiz including (OSHA 29 CFR 1910.179 requirements, ASME B30.2 inspection protocols, ISO 9927 specifications, documentation procedures)

  • Inspection procedure evaluation including (identifying critical inspection points, recognizing defects requiring immediate attention, completing inspection forms, determining serviceability)

  • Emergency response scenarios including (selecting appropriate actions for equipment failures, suspended load protocols, collision response procedures, evacuation procedures)

Why Choose This Course
  • Comprehensive alignment with OSHA 29 CFR 1910.179, ASME B30.2, and ISO 9927 regulatory standards

  • Hands-on practical training with actual RTG equipment in operational terminal environments

  • Focus on precision control and efficiency techniques essential for modern container terminal operations

  • Advanced anti-collision and automated positioning system training for latest RTG technology

  • Industry-recognized certification demonstrating competency in specialized container handling equipment

Note: This course outline, including specific topics, modules, and duration, can be customized based on the specific needs and requirements of the client.

IPAF - 1a Static Vertical Personnel Platform Operator Training Course
IPAF - 1a Static Vertical Personnel Platform Operator
Learn More
SASO Approved - Motor Grader Operator Training Course
SASO - Motor Graders Operator
Learn More
SASO & LEEA - Forklift Operator Training Course
SASO & LEEA - Forklift Operator
Learn More
Fire Warden Training Course
Fire Warden
Learn More

Recommended Courses

All Courses

Course Title

Rubber Tire Gantry Crane Operator

RTG crane operator training per OSHA 1910.179, ASME B30.2 & ISO 9927 covering safe operation, container handling, spreader use & yard operations.

Rubber Tire Gantry Crane Operator Training Service | in Dammam - Riyadh - Jeddah - Makkah
bottom of page